There are still a few things left for the contractors to do, and even more things for us to take care of, but we are getting so close to moving. In fact we have even started moving!

Stairs are done and looking awesome!



Before
 


After


Master Bath
Before
After
Before
After

Pianos getting moved in! Yep, its getting real! On a side note... if you need piano movers, these guys are awesome.  I wouldn't trust moving the delicate 800 pound beast to just anyone.



 Without internet, Ian discovered this little thing called 'the outdoors...' We have a decent climbing tree in the backyard.

3rd Floor got some carpet.

 Mantle Prep.  Matt and Greg made the mantle, they did an amazing job!


Before


After

Boys Bathroom

Before
After



Before
After




Half Bath Makeover! Yikes, I can't believe it used to look like that!

Before

After






Comments

Popular posts from this blog

Finally Some Tile!

Terri and Ian are both at summer camp for the Boys Choir this week, so she has left me in charge of the blog.  I'm not as cute or witty as Terri, but I'll do my best to fill her tiny open-toed shoes. We finally had some good progress today after a string of frustrating days with little-to-no activity. The tile for the bathrooms arrived and they nearly finished the boys' bathroom in a single day.  I love the niche!  They were supposed to add the same detail trim to the boys shower that is going in the master shower though.  Another call to the contractor....         Last week they installed the shower pan in the master bath and the finished off the drain plumbing.  Today they got the Hardibacker board mostly installed and it's nearly ready for tile.   Master shower all framed out Plumbing finished and shower pan/liner added Hardibacker board installed and we get a niche too! They laid some sort of sand material on the shower floor to provid

2 Steps Forward, 1 Step Back

Sorry it's been awhile since the last update, thing have been moving, but slowly.   2nd Bathroom:  Counter tops, plumbing, and hardware! New shower backer, all ready to be tiled... as soon as the tile comes in. It was supposed to be in last week (sad face).  The shower had drywall behind it before, but I feel a whole lot more comfortable with hardibacker wet area cement board.  So it feel like things are really moving along... and then you realize you have a toilet in your hall. This spawned an amazing quote from my good friend, SM: Life Lesson #679 courtesy of Cannon Renovation: "Sometimes we just have to appreciate the positive and hope our crap ends up where it should..." Master Bath: we've got some materials in: master shower flooring Shower detailing I love, love, love our silver travertine counter tops! We got to go pick out our slab and I'm so glad we were picky, it looks great with the cabinets.   Plumbing and ha

Stairs and Flooring

Well, it's been a long time since I've posted anything because it seems like a long time since any real progress has been made on the house.  I think that in the wake of Hurricane Harvey all of the subcontractors took on extra work and our house was neglected :( But we are back on track and the stairs are done!  They still need to be stained, but it's exciting to see the the carpentry done because this was the impetus for the whole renovation project.  We knew we needed to redo the stairs and everything else just snowballed from there. 'Before'             The stairs look great!!! They have started on the flooring this week and have already made great progress.  There is a lot of floating required to level the floor, so that is slowing things down, but I love the way the laminate looks. Leveling the floor outside the master bathroom The living room floor was pretty torn up from removing the tile and they had to pretty much float the