I can't believe it, the bathrooms are all tiled! The pebble floor turned out great. We still need to install the fixtures in the Master shower as well as the drain in the boys bathroom. Tomorrow (hopefully) the master shower will be measured for the frame-less glass enclosure.
Master Shower
Boys Shower
I love the gray tile against the espresso cabinets. I can't wait to see what it looks like once it's all painted and cleaned up.
The plumber finished moving the gas line from behind the fireplace brick. Now that the tile installer has finished with the bathrooms he is ready to start working around the fireplace. Let's see if he actually gets to it this week.....
Greg finished all of his to-do list inside the house (garage still needs to be cleaned out). The last thing he did was install the latch on the pocket door. It looks great. Ian told me that the pocket door is his favorite feature of the new house.
I've finished changing out all the outlets and switches on the ground floor, but that's not really picture-worthy.